| This 1953 Cub is getting a new lease on
life. Graves Implement has totally rebuilt the engine, the
rear-end, and the transmission, and has replaced all the seals. It
is running again, sandblasted, primed and ready to be painted. |

|
| This WD-6 is in the shop to be
sandblasted and painted with Urethane paint. It will also receive new tires and an
injection pump. |
|
B
E
F
O
R
E
|
 |
| WD-6 with epoxy primer. The WD-6
was split with an Omar splitting stand. Omar
Associates |
 |
|
A
F
T
E
R
|
 |
| WD-6 with a Super W6-TA. The WD-6
was painted with urethane and the W6-TA was painted with 2150 |
 |
| This is a 1967 656 that Dave cleaned and
painted. |
|
B
E
F
O
R
E
|
|
|
A
F
T
E
R
|
|
| Dave cleaned and painted this 1947 A. |
|
B
E
F
O
R
E
|
 |
|
A
F
T
E
R
|
 |
| This is an Allis-Chalmers
that was cleaned and repainted. |
|
B
E
F
O
R
E
|
 |
|
A
F
T
E
R
|
 |
| This 1953 Allis-Chalmers WD-45
had not run in ten years. Graves Implement changed it to a 12-volt
system, gave it a tune-up, sand blasted it, and gave it a fresh coat of
paint. |
|
B
E
F
O
R
E
|
 |
|
A
F
T
E
R
|
 |